Indoor satellite assembled in 2025 at the facilities of Jealsa in A Coruña (España) for our client POLYPAL.
Data of the work:
Weigth: 648,5 Tn.
Height: 15,4 m.
Duration: 14 weeks.
Indoor satellite assembled in 2025 at the facilities of Jealsa in A Coruña (España) for our client POLYPAL.
Data of the work:
Weigth: 648,5 Tn.
Height: 15,4 m.
Duration: 14 weeks.