Pallet's Rack cladd building assembled in 2023 in Alemania for our client TGW Austria.
Datos de la obra:
Weight: 1.327 Tn.
Duration: 34 weeks.
Pallet's Rack cladd building assembled in 2023 in Alemania for our client TGW Austria.
Datos de la obra:
Weight: 1.327 Tn.
Duration: 34 weeks.